New construction 1998
To adjust the work and production conditions to the new requirements and also to prepare them for future needs, the production and office building was reconstructed. This was achieved by an optimized and flexible utilization concept and a solid and formidable architecture.

The building complex consists of 3 parts:

The administration building is built in a conventionally massive way out of ferroconcrete and KS-brickwork with multilayered facade and lean-to roof. Likewise the entrance building, which highlights itself with its distinctive shape and as well functionally as architecturally serves as link between administration and production. The assembly hall is a steel-porous concrete industrialized building with an arched roof and functional extension.

 

Extension 2008
2008 an extension was necessary due to the rising need of production area. In order to technological connect the free margin ideally, and to obtain further extension options the extension occured at the back side of the assembly hall. Analog to the existing hall the building is made of steel-porous concrete industrialized building manner. The site development occurs via the existing main traffic artery in the inventory.